Tag Archives: Project Timesheet

TimeControl Industrial 8 now available

With the successful launch of TimeControl 8 only a few days ago, we’ve now released TimeControl Industrial version 8.  The TimeControl 8 version already included numerous features that will be of interest to all TimeControl Industrial clients.

crew_tsentry_3There are also some features very specific to TimeControl Industrial in this edition.  Some of these include:

Crew Timesheets in TimeControl Mobile

TimeControl 8 includes the free TimeControl Mobile App and TimeControl Industrial users can, for the first, time create and edit Crew Timesheets and edit Crew members while mobile.  With nearly half of the total global workforce expected to be comprised of mobile employees by 2022, these new features in TimeControl Industrial Mobile will be welcome.

Manage Crews in TimeControl Mobile

Not only can supervisors and team leaders create crew timesheets while on the go, they can also use the TimeControl Mobile App to update team members.  A team lead who is out in the field with their crew can start their shift by updating their crew and then updating Crew Timesheet information as the day progresses no matter where they are.

Support for TimeControl Mobile when disconnected from the Internet

TimeControl Mobile has been enhanced so that if connection to the Internet is interrupted; something that can occur more frequently in remote construction sites, the App will continue functioning and will automatically syncronize with the central application as soon as a connection is re-established.

Mobile Views

The TimeControl Mobile App includes dynamic data analysis for management of all timesheet data under their control.  Instant graphics in numerous formats will enable rapid decision making based on where time is being spent.

The upgrade is available to existing on-premise clients with a current support and maintenance agreement at no additional charge from the TimeControl upgrades site at: Industrial.TimeControl.com/support/updates. TimeControl Industrial 8 will be upgraded automatically for TimeControl Online subscription clients in mid-July.

For further information, please visit Industrial.TimeControl.com or email info@hms.ca.

TimeControl 7.4.1 is now available!

We’re delighted to tell you that TimeControl 7.4.1 is now available for download.  This version updates TimeControl, TimeControl Industrial, TimeControl Online and the free TimeControl Mobile App.  TimeControl and TimeControl Industrial clients with a current support and maintenance agreement can download the new version immediately at TimeControl.com/support/updates.  HMS is preparing for the upgrade of TimeControl Online which will happen automatically in the next 2-3 weeks.  TimeControl Online customers will be notified a week in advance of the update.

There are many new features to be excited about.  Here are some of the highlights:

Charge Hierarchy

TimeControl now supports multiple methods of displaying a hierarchy of charge codes.  TimeControl has long been recognized for supporting hierarchical charge structures but the new functionality takes this to a new level.  Field hierarchy permits hierarchy to be built from multiple user defined fields in the Charge Table and you can create multiple breakdowns then switch them on the fly when you’re searching for charge codes in the timesheet!

Numerous new API methods

We have made extensive additions to the TimeControl API making it even easier to integrate TimeControl as part of an overall corporate environment.

Mobile Debit/Credit Adjustments

The TimeControl Mobile App now allows Debit/Credit update Adjustments.  This allows supervisors and administrators to open a Posted timesheet and apply adjustments to that timesheet and release those adjustments to Posting.

Mobile Posted Expenses and Attachments

The TimeControl Mobile App now includes the ability to view the expenses that are attached to a posted timesheet in the past as well as any attachments that might have been associated to the timesheet or expenses.

Assignments

We have made major changes to the Assignments Table.  Assignments can now be made as part of a person’s full time availability so one person could be put on two tasks simultaneously at 50% of their availability each.  You can also now have the assignment start and finish be dates other than the charge start and stop so assignments that were meant to occur only during part of the charge can be defined that way.

Administrator configuration enhancements

We have taken numerous elements of the TimeControl configuration and moved them from the TimeControl.INI file into the Administrator System Preferences and User Profiles functions.  This will make a huge difference for TimeControl Online environments where some of these features had to be managed at the server level.

New User Profile Features

There are numerous new settings in User Profiles that allows TimeControl’s configuration to be tailored to the person or group with that User Profile setting.  These changes include all-new Super-User reject and Modify rights .  You can also change how the Timesheet List appears, allowing only a certain number of weeks in the past or future to display.  A new Highlight feature helps when adding a timesheet by highlighting the current week or the last missing week for a new timesheet.

Control Period Create Times

When creating timesheets, TimeControl allows the number of periods in the past and the future to be constrained to avoid accidentally creating a timesheet in the wrong period or in a period when Finance is not expecting it.

Copy Hours

We’ve made it possible to control who is allowed to copy hours when creating a new timesheet using the Copy Timesheet function and activated the ability to copy hours.

And…

There’s so much more.  We’ve done a lot of work on high volume capacity, improved performance, added more revision auditing, and improved usability across the application.

Find out more at TimeControl.com/features/latest

A timesheet, is a timesheet, is a timesheet… Isn’t it?

A timesheet is just a timesheet, isn’t it?

Not so much.

What we’ve found here at HMS since 1984 is that timesheet requirements seem to be all the same until you put different departments who need them into the same room. Suddenly, the requirements seem quite different.

In 1984 when we were working on the very first mandate as HMS Software, we had to create a timesheet that would encompass the requirements of payroll and project management at the same time. The design requirements were so different, we ended up almost doubling the effort we had estimated in doing the work originally.

We needed a Time and Attendance timesheet for payroll with numerous requirements from the Finance department.

We also needed a task-based project tracking timesheet with the ability to update the project management schedule.

And, that was complex enough. The project was delivered successfully but the seeds had been planted for what would ultimately become the commercial TimeControl 10 years later.

As we did design on the out-of-the box multi-function TimeControl we realized there were more types of timesheets than just those two.

How about Time and Billing? What about Job Costing?  How about timesheets for R&D tax credit compliance and so on.

We’ve created a short white paper identifying some of the timesheet types that we are most commonly asked about but this is not a theoretical exercise. If no one intervenes in what kind of timesheet to select, the most likely result is that multiple timesheets will be implemented.  Payroll and HR will want a Time and Attendance timesheet.  Finance may require a Time and Billing timesheet or a Job Costing timesheet or both.  There may be requirements from Sales or Contracts to comply with government regulation timesheets in order to successfully comply with a new order or contract.

In some organizations we arrive to find 2, 3, 4 or even more timesheets all deployed at the same time. In a worst case scenario, employees must fill in 2 or 3 timesheets every week to accommodate all the requirements.

The best solution for this dilemma, as we discovered over 3 decades ago, is to create a multi-function timesheet that has a single interface in the front end so it is easy for end users, yet has all the controls that each of these requirements demands in the back end so Administrators can fulfill the different needs from a single source.

You can read the Timesheet Types and TimeControl white paper at: TimeControl.com/pdf/whitepapers/tc_timesheet_types.pdf.  To see our complete list of white papers, visit TimeControl.com/resources/whitepapers.

FAQ: Do we need to standardize on a single project management system before integrating TimeControl?

RubicStandardize_300x225No you do not and TimeControl is ideally suited for this type of challenge.  The pre-defined links to project management tools can link a TimeControl Project and associated charge codes to project information in Microsoft Project 1995 and up Microsoft Project Server 2002 and up, Oracle Primavera P3 through P6, Deltek’s Open Plan, InEight’s Hard Dollar HD and VersionOne.  And, it can link to all of those systems simultaneously.  TimeControl is designed to make as many project system connections as you wish and then each project can be linked through that connection to a project in that system.  This allows TimeControl to not only link some projects to Microsoft Project and some to Primavera P6 but TimeControl can link to multiple versions at the same time.  Imagine a situation where some projects are being managed in Microsoft Project Server 2010 and some are being managed in a separate instance of Microsoft Project Server 2013.  TimeControl could link to both systems at the same time and a TimeControl user wouldn’t have to worry about it.  They would just enter their complete timesheet in TimeControl and the data will go to the right project system and the right tasks in the background!