All posts by chris.vandersluis

TimeControl Industrial 6.4 now available

This is a big month of announcements at HMS.  As you may have seen in our last newsletter, we have completed the migration of TimeControl Industrial into the TimeControl 6 family. This is a major new version of the TimeControl Industrial edition. TimeControl Industrial 6.4 has been designed specifically for field data collection of labor and non-labor usage on industrial and construction field sites. This builds on the already popular functionality of the classic TimeControl and delivers a timesheet system that can be used simultaneously for back office and field personnel as well as a field data entry system for material consumption, equipment usage and even production values accomplished.

We’re extremely excited about TimeControl Industrial coming into the TimeControl 6 architecture.  Bringing TimeControl Industrial’s field data collection functionality together with the highly flexible functionality of the classic TimeControl is a winning combination for many of our clients.”

TimeControl Industrial adds several elements of functionality that are ideally suited to collecting data in heavy construction, offshore, industrial or plant shutdown environments where the employees doing the work don’t have access to computers to enter the data themselves. These functions include:

Crew Timesheet Entry
TimeControl Industrial adds an additional timesheet interface to the weekly timesheet that is TC64_CrewEntry_300x209included for back office workers. TimeControl Industrial’s Crew Timesheet Entry allows crews to be assembled and then time entered for the entire crew at once. Crew Timesheet supports weekly, daily or even multiple timesheets per day to accommodate multiple shifts. Blank timesheets can be carried by the foreman or supervisor and then the timesheet for the entire crew is entered at one time. The Crew Timesheet Entry interface is included as both a web-browser and Windows Application Interface.

Material / Equipment / Production Entry
TimeControlIndustrial extends Field Data Collection beyond timesheets with the Material / tc6_materialentry_300x209Equipment / Production Entry interface. Non-labor cost entries can be allocated by project, by task, by resource and with a limitless number of possible rates to track material used, equipment expended and even production values of what was accomplished. This module is also delivered as both a web-browser and Windows Application interface for high-volume entry. When combined with either the Non-labor rates tables or the Extended Materials Rate system, multiple values can be tracked at once such as the actual internal cost, estimated cost, average project cost and invoiceable billing price. Once entered, Material / Equipment and Production can have unique approval paths or can be approved along the same lines as the Crew Timesheets.

Extended Rates
TimeControl Industrial includes functionality to vastly extend Rate tracking to atc6_crewextendedrates_300x238ccommodate complex burdened or premium rates or rates that vary for particular conditions. Imagine a field situation where unionized workers are paid different hourly premiums if they work the evening or overnight shifts and additional premiums if they work in inclement weather or in a remote location. Or imagine equipment costs that are different if the equipment is used at night or when the temperatures are very warm or very cold. Managing this with a traditional timesheet could be a challenge, but not with TimeControl Industrial, The extended Rates system handles these types of situations easily by matching user-defined and existing columns of data in the Crew Timesheet Entry and Material / Equipment / Production Entry interfaces with identical columns in the Extended Rates table.

TimeControl Industrial delivers a highly flexible timesheet and material / equipment / production data collection system to the field. It has been developed with requirements straight out of field use with our clients and we have found from experience on client sites that it delivers increased productivity. But, we also know that organizations and requirements change and TimeControl Industrial’s flexibility means the system can adapt whenever that is required.

TimeControl Industrial includes all the functionality that has made TimeControl one of the world’s most respected timesheet systems including links to project management systems such as Oracle-Primavera, Microsoft Project and Deltek’s Open Plan. It also includes links that can be defined for Payroll, HR and Finance systems as well as ERP systems such as PeopleSoft, Oracle Financials and SAP.

TimeControl Industrial is available immediately. Clients with current support contracts have access to the upgrade at no cost. For more information on TimeControl Industrial, visit http://industrial.timecontro.com.

TimeControl Industrial is available both for installation on premise or as a subscription in the cloud online.

About TimeControl
TimeControl was originally released in 1994. It was immediately successful in the project management sector and today is recognized not only as a project management solution, but also as an enterprise timesheet solution in use by companies worldwide. TimeControl is designed as a multipurpose timesheet able to serve the needs of both Finance and Project Management simultaneously. It includes features such as a multi-browser, multi-device interface, a PC and mobile interface, vacation approvals, executive dashboards, extensive approval functionality, flexible reporting and links to project management and corporate systems which makes the timesheet product ideally suited for integration with existing systems in any organization. TimeControl’s flexibility allows it to be deployed for use as a time and attendance, time and billing, project tracking and flex-time system.  TimeControl is available both for purchase for an on-premises installation or as an on-line subscription in the Cloud.
For more information about TimeControl and TimeControl Industrial, monitor the TimeControl blog at blog.timecontrol.com, the TimeControl Industrial website at industrial.timecontrol.com or the main TimeControl website at www.timecontrol.com.
For information about TimeControlOnline, our hosted timesheet subscription service in the cloud, go to www.timecontrol.net.
For any other questions, please contact HMS Software at info@hmssoftware.ca.

HMS has representatives or distributors in Argentina, Canada, Chile, China, Egypt, Finland, Ireland, Malaysia, the Netherlands, Russia, Saudi Arabia, Singapore, Sweden, Thailand, the UK, and the U.S.

About HMS Software
Based in Montreal, Canada with offices in Toronto, HMS Software has been a leading provider of project management and enterprise timesheet systems and services since 1984.  HMS Software’s first customized timesheet application was written in 1984. With the launch of TimeControl as a commercial application in 1994, HMS Software began servicing clients worldwide. 

HMS Software’s client list reads like a who’s who of business. It includes Acergy, Aecon, Rio Tinto, the Atlanta Airport, the City of Montreal, the County of San Mateo, Electromotive Diesel, EXFO, FT Services, Kelly Services, Koch, Merck Frosst, the Government of Quebec, Georgia Pacific, Parker Hannifin, Rolls Royce, Sobeys, Volvo Novabus, Zimmer Inc. and hundreds of others. 
For further information about HMS Software, please visit the HMS website at: www.hmssoftware.ca or contact us at info@hmssoftware.ca.

The nature of training on enterprise systems

7438350“How long will it take us to get completely trained?” I was asked recently.

“That would depend completely on your definition of ‘completely’,” I replied.

The challenge with enterprise products like TimeControl is that they can be configured to be so many different things for so many different people.  The strength of TimeControl is its flexibility.  This allows TimeControl to be a multi-purpose timesheet serving the needs of many different perspectives within the organization.  It can be used for time and attendance, time and billing, project management tracking, earned value, government compliance for R&D tax credits or the DCAA.  And all this from the same interface at the same time.

Yet not every organization is created the same.  Not every organization requires the same types of functions or tracking.  Even when two clients have a similar product to like to like SAP or MS Project, those products are not configured identically either.  So each implementation of TimeControl is often unique. Oh there are common elements but there are many elements that are different and not everyone even uses the same functionality.

What we’ve discovered here at HMS when we apply this challenge to training is that training is best done in layers.  The first layer or phase occurs during the original implementation.  If our technical staff assist with the implementation, we train the administration staff as we make decisions together on how to configure the system.  This has a high degree of success but does it mean that these administrators are “completely” trained?

If your definition is, “The administrators should be able to operate TimeControl in accordance with the configuration and existing processes we have defined at the time of implementation.” then the answer is Yes. 

But, let the company advance for 6 months or a year even and we find that the level of maturity in the use of TimeControl in the organization is now such that the types of questions the client would ask have evolved.  Now there are questions on functionality that would have never been asked during the original implementation because the questions are now able to be understood or because the organization itself has evolved to have new timesheet requirements.

This isn’t unique to TimeControl.  We’ve seen similar phenomena when we look at project scheduling tools like Primavera, Open Plan or Microsoft Project Server.

Our view is that training should be an ongoing investment.  Do a little less on the first day than you’d expected.  Let that training soak in; be absorbed; be implemented in practice.  Then having a trainer come back or do another remote session for a few hours.  Use that to advance your own knowledge but also to advance the capabilities used of the software.  As new administrators come on board over time, they’ll naturally just take up training that is regularly scheduled. 

Doing training in phases or layers ultimately gives the best return on investment.

Did you catch us in the recent InformationWeek report on Software as a Service (SaaS) Project Management Tools?  Yes, that was TimeControlOnline listed in tools you can use to manage your projects online through a subscription service.

The article is free and can be found at: Information Week Reports.
For more information on TimeControlOnline, you can go to www.timecontrol.net.

Our president is speaking at ProjectWorld Toronto on Monday

IMG00071-20110215-1257Chris Vandersluis, the president of HMS will be speaking at ProjectWorld Toronto on Monday, May 14th.  The subject is “getting more resource capacity without spending more money” and focuses on how timesheet practices can help find resource capacity you didn’t even know you had.  ProjectWorld runs on May 14th and 15th at the Metro Toronto Convention Centre (South Building) and Mr. Vandersluis’s talk will be at 3:45 on May 14th. 

For more information, visit ProjectWorld’s website at www.projectworldcanada.com.

HMS is going to London… Ontario that is

boothAre you going to the PMI Southwest Ontario Symposium?  Us too!  HMS will be exhibiting at the SWOC PMI Chapter’s Symposium event on April 27th.  The event is being held at the

Lamplighter Inn & Conference Centre at: 591 Wellington Road, London, Ontario.

If you are interested in meeting HMS staff in person or talking to us about TimeControl or other HMS Services and are in the area, then please let us know.  If you are attending the symposium and would like to make sure we organize an appointment with you, please email info@hmssoftware.ca or give us a call at 514-695-8122. 

For more information on the symposium, go to: www.pmiswoc.org

Our president is in Vegas speaking at Collaborate12

Chris_Feb2011_500x621Chris Vandersluis, the president of HMS Software is in Las Vegas next week to speak at the Oracle Application Users Group meeting; Collaborate12.  The topic of his talk is “Using Best Timesheet Practices to increase your Resource Capacity”.  The talk is scheduled on April 24th at 10:45am to 11:45am in Conference Room: “Breakers J”

If you are attending Collaborate 12 and wish to meet Mr. Vandersluis, please let us know at info@hmssoftware.ca.  For more information on the conference, go to collaborate.oaug.org.

Our president is speaking in Ann Arbor on Monday

IMG00071-20110215-1257Chris Vandersluis, the president of HMS will be speaking at the PMI Huron Valley Chapter in Ann Arbor, Michigan on Monday, April 16th.  The subject is: “Increasing your project resource capacity without increasing your project resource costs” and focuses on how timesheet practices can help find resource capacity you didn’t even know you had.  The event starts at 5:30 and is located at the Holiday Inn Ann Arbor located at: 3600 Plymouth Rd, Ann Arbor, MI 48105.
For more information, visit the Huron Valley PMI chapter site at: www.pmi-hvc.org.

New white paper: The Timesheet Approvals Challenge

We’ve done a rewrite of our core white paper; the document that describes how TimeControl became one of the world’s most popular timesheet systems.  “The Timesheet Approvals Challenge” shows why so many organizations end up implementing more than one timesheet system.

We know that no one wakes up one day and says “I’ve got a great idea.  Let’s deploy as many timesheet systems as we can find,”

The problem is that different aspects of the organization are trying to solve different problems and even if they find a powerful timesheet, where it breaks down is in the concept of approvals and that is most challenging in a matrix organization.

When an organization needs a timesheet for only time and attendance, timesheet approvals are fairly straightforward.  We have the supervisor approve the timesheet in its entirety along with any time off that was recorded. There are timesheets that cater to this need.

When it needs a timesheet for only project tracking, again timesheet approvals are fairly simple.  We have project managers approve the time allocated to each task.  There are timesheets that cater to this need.

When the organization needs a timesheet for only HR Tracking, timesheet approvals are again quite basic. HR supervisors will ensure that the timesheet does not exceed entitlements for vacation, sick leave or personal time off. There are timesheets that cater to this need.

When a timesheet is implemented for billing, it is the account manager and the billing clerk who will review the time and ensure it meets the billable criteria and has the appropriate rate.

But, what do you do when you have more than one of these requirements?  It is to this environment that “The Timesheet Approvals Challenge” white paper was created.  The paper outlines the timesheet selection and implementation difficulties that are most prevalent in industry and outlines how organizations try to overcome them.

The paper lays out key criteria for deploying a multi-purpose timesheet with the approvals functionality required to allow a single timesheet interface to collect and approve the timesheets for multiple requirements.

Access to the white paper is free and can be found on the Matrix Approvals Solution portal of HMS Software’s TimeControl website at timecontrol.com/solutions/matrixapprovals.

An all new and improved Primavera Solution Portal

We have many clients who use TimeControl with their Oracle-Primavera system.  Perhaps it’s no surprise.  TimeControl has integrated with Primavera since 1997 with P3 and we’ve maintained that link all the way up to the most recent P6r8 release even once Primavera was purchased by Oracle.  Primavera clients who need a single timesheet to update not only the task progress in Primavera but also Payroll, Billing, Finance, Job Costing or HR have looked to TimeControl to provide multi-purpose timesheet functionality that will allow a single point of timesheet entry and multiple back-end uses.
Our relationship with Primavera goes back to 1997 and our relationship with Oracle separately tc6_p6_linkalso goes back to 1997 when TimeControl was first able to store its data in either SQL Server or Oracle (We now also support MySQL which is coincidentally also owned by Oracle).  So the relationship has many facets and runs deep.
We’ve done a little work to remake our TimeControl and Primavera Solution Portal with a range of new materials that we hope you’ll find useful.  Aside from a remake of the portal itself, we’ve got new factsheets, slide presentations, white papers and an all-new on-demand webcast that shoes TimeControl 6 and Primavera’s P6 interacting back and forth.
The integration options between TimeControl and Primavera are extensive.  Not only can you bring into TimeControl Primavera tasks, resources, steps and assignments, you also have abilities on how to match employees to generic skills and Primavera codes to TimeControl user defined fields.  Updating your Primavera project data with TimeControl timesheets is incredibly flexible.  You can update hours and costs, Primavera Step progress, ETC, Financial periods and more.
The new and improved TimeControl / Primavera Solution Portal covers some of the benefits of integrating these two world-class tools including:

  • Automated Business Validation Rules
  • Extensive Rate Management
  • Management of Vacation, Sick Leave, Personal time banks
  • Management of Banked Overtime
  • Included integration with P6 and other project systems
  • TimeControl Mobile interface for tablets and smartphones
  • Missing timesheet management
  • The Matrix Approval Process for Labor Actuals™

Access to the portal and its resources is free.  Find out more at www.timecontrol.com/solutions/primavera.