Tag Archives: sharepoint

Join our live Webinar showing TimeControl and BrightWork together

TimeControl is a multi-purpose timesheet designed to integrated with multiple project management systems. When it is integrated with BrightWork, you can create a collaborative project management SharePoint environment where the organization’s timesheets are blended naturally into the project process.

On Wednesday, May 12th at 11am EDT, 8am PDT, 4pm GMT BrightWork and HMS Software will co-host a live webinar showing how to enhance your Project Analysis in SharePoint using BrightWork and TimeControl.

You will discover:

  • How to quickly get started managing projects and portfolios with SharePoint
  • How integrating TimeControl as an enterprise timesheet brings a single point of entry for timesheets into the project environment
  • A live demo of BrightWork and TimeControl working together

Don’t worry if you can’t attend! Sign up anyway and we will send you the recording.

The Webinar is scheduled for July 11th at 4pm GMT, 11am EDT, 8am PDT.

To Register click: Register Here.

Leverage SharePoint with TimeControl

Sharepoint_TC_Puzzle_300x257TimeControl is a web timesheet application which has several integration points with TimeControl

SharePoint has emerged over the last few years as Microsoft’s fastest growing product line ever and millions of users now use Microsoft’s collaboration platform as they’re underlying operating environment.  TimeControl has had links to SharePoint since version 2002 and links with SharePoint 2002 – 2016 have all been maintained.

There are several ways SharePoint can be leveraged with TimeControl:

  1. Display platform
    sp_tc6timesheet_300x216TimeControl can be installed and configured to display from within a SharePoint page.  TimeControl is not just a web-part.  It is a complete web application but it was designed from the outset to be able to be displayed inside of SharePoint.
  2. Project/Task link
    TimeControl has a direct transfer link with SharePoint much like the links to other project management tools like Microsoft Project, Microsoft Project Server or Primavera.  The SharePoint link allows a SharePoint list of tasks to be automatically transferred in to TimeControl’s Charge Table along with resource assignments.  Then that list of tasks can be used in TimeControl just like any other project’s charges within the timesheet.  Transfers can be done on demand or on schedule.
  3. Integration TimeControl Data into SharePoint
    TimeControl fully supports Microsoft SQL Server and when TimeControl and SharePoint are installed together they are usually sharing a database server.  This allows SharePoint to take advantage of information in TimeControl directly for SharePoint dashboards made in SQL Server Reporting Services or the Dashboard builder of your choosing.  You can also blend TimeControl’s data into reporting mashups with your SharePoint data.

In addition TimeControl has extensive links with other Microsoft products like Excel and Microsoft Project.

To find out more about how TimeControl can leverage your SharePoint platform, see the use-case solutions page at: www.timecontrol.com/use-cases/sharepoint on the TimeControl.com website.