Integration_300x227.jpgWe talk often about how TimeControl can link with many different systems but it’s worth taking a moment to talk about the pre-established links that all versions of TimeControl ship with.

Links to and from project management tools must each be designed from two perspectives:

  1. What is the connection mechanism for this project link?
  2. What business rules does this project management system require to pull information and then to push the update data back?

For each project system there are different features that don’t exist in the others.  For example, Primavera has a progress methodology called “Steps”.  TimeControl supports the progress of Steps but there is no such mechanism in Microsoft Project so Steps data doesn’t come in from or go out to Project.

In some systems there are more than one connection mechanism.  For example, Microsoft Project Server can be linked through Microsoft Project or directly with Project Server’s PSI (The application programmable interface for Project Server).

So, what project management tools does every version of TimeControl have a predefined link with?  Here’s a list:

Transfer in Transfer out
Microsoft Project  checkmark_green_36x30  checkmark_green_36x30
Microsoft Project Server  checkmark_green_36x30  checkmark_green_36x30
Oracle-Primavera P6  checkmark_green_36x30  checkmark_green_36x30
Oracle-Primavera EPPM  checkmark_green_36x30  checkmark_green_36x30
Deltek Open Plan  checkmark_green_36x30  checkmark_green_36x30
Deltek Cobra  checkmark_green_36x30  checkmark_green_36x30
VersionOne  checkmark_green_36x30  checkmark_green_36x30
SharePoint  checkmark_green_36x30  xmark-red_32x30
Hard Dollar HD PCM  checkmark_green_36x30  checkmark_green_36x30

There are numerous resources available on the TimeControl website for each of these links:

For Microsoft Project, Project Server and SharePoint, see these use-case solution areas:

For Oracle-Primavera’s P6 and EPPM, see these use-case solution areas:

For Deltek EPM including Open Plan and Cobra see this use-case solution area:

For VersionOne see this use-case solution area:

For Ineight’s Hard Dollar HD PCM see this use-case solution area:

For all use-cases go to the Use-Case Solutions or contact HMS at info@hms.ca where we’ll be happy to talk to you about your particular needs.